this is gonna win!!!!
this is gonna win!!!!
smells like teen $$$$pirit and u know what that means
this is gonna win!!!!
smells like teen $$$$pirit and u know what that means
:shrug: ray, am i better off replacing or top coating a 30 yr old driveway, live in wisconsin. drive is in decent shape other than some pit holse and minor cracks
thanks
:shrug: :shrug:
ps thanks for the pix as well
GL tonight RAY...I do asphalt myself, but a concrete question for you.. I'm pouring on FRI, side of the house and back patio, 1 slab.. How long after should I cut.......
Ray if this is a lock why did you have a 200x play yesterday and you are only playing this as as 50x just a quick question because I want to unload on it... Thanks Dude
sawcut control joints = within 12 hours at least
10.000 units ????
I WAS HOPING MORE LIKE 1,000,000,000 UNITS
:shrug:
![]()
:sadwave:
![]()
We use essential cookies to make this site work, and optional cookies to enhance your experience.